Guiding Star Long Leash for Dogs Outside Long Line Dog Leash for Training Extra Long Lead for Dog Leather Leashes for Dogs (20ft*3/8")

★★★★☆ 4.0 42 reviews

US$12.80
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.africanfish.ca
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$12.80
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 25
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.africanfish.ca
Free 30-day returns Details

Product details

Management number 225203167 Release Date 2026/05/09 List Price US$12.80 Model Number 225203167
Category

Guiding Star Long Leash for Dogs Outside Long Line Dog Leash for Training Extra Long Lead for Dogs Long Leather Leash for Dogs (20ft*3/8")

  • 【Long Leash for Dogs】Our long leather dog leash is made of full grain Italian leather, make this long leather dog leash very soft, strong tensile resistance, the thickness is 4.8mm, which much more durable than waterpoof dog leash and Biothane dog leash. Twist braided on the joint of the clip and handle make this braided leather dog leash fashionable and heavy duty. The clasp is made of rust-proof brass which is superior in both strength and durability than nickel plated hardware.
  • 【Long Dog Leash】The genuine leather dog leash measures L15’ x W3/8”; L30’ x W3/8”, ensuring that there is a suitable lead for any dog and every task. Let you comfortably grab the handle while give your dog enough freedom of movement for casual loose leash walk and highly recommend by many dog trainers or owners.
  • 【Long Leash for Dogs Outside】This long dog leash not only for training, but also is good choice when walking, hiking, jogging, camping, hunting, backyard, beach, recall training, outdoor play with tennis balls no matter if your dogs small medium to heavy duty. Let our dogs more freedom!
  • 【Long Leash for Dog Training】This long leather leash for dogs finished water resistant to enable dog walks in the rain, but cannot be soaked in water. If the leather leash gets dirty, it can be wiped with a damp cloth. If you feel that the leather leash is not as soft as before after using it for a long time, for black and brown leather, you can use oil to wipe it. (edible oil is sufficient). For light colored leather leash, red, ect., you can use hand cream to wipe it.
  • 【Dog Leash】Guiding Star only provide genuine leather dog leash to our customers, our mission is to make every of our customers and their pets use high quality leather, feel safe and be happy. If you have any questions, feel free to contact us at any time.
ASIN B0DLGQRNXL
Size 20ft*3/8"
Color Brown
Pattern Solid
Brand Name Guiding Star
Unit Count 20.0 Feet
Closure Type Clip
Manufacturer Guiding Star
Material Type Brass, Leather
Item Dimensions L x W 0.38"W

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4 out of 5
★★★★☆
42 ratings | 17 reviews
How item rating is calculated
View all reviews
5 stars
75% (32)
4 stars
8% (3)
3 stars
4% (2)
2 stars
2% (1)
1 star
11% (5)
Sort by

There are currently no written reviews for this product.