Dogs My Love Thick Nylon Multifunctional Euro Dog Leash 1.25" Wide Adjustable 44"-70" Long Lead for Large XLarge Breeds

★★★★★ 4.9 118 reviews

US$8.76
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.africanfish.ca
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$8.76
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 16
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.africanfish.ca
Free 30-day returns Details

Product details

Management number 217901260 Release Date 2026/05/03 List Price US$8.76 Model Number 217901260
Category

Adjustable European leashes have been popular with dog obedience trainers, professional handlers, police K9 trainers around the world for years. This Classic Adjustable Leather Dog Leash is designed to make walking your dog easy! Perfect for walking with any dog, you can easily adjust the length of this leash to make sure you and your pet are always comfortable. Multiple functions in One Versatile Leash! This size is most suitable for large and Xlarge breeds. Made of 1.25" wide strong and durable fray resistant nylon. Dimensions: 1.25" Wide x 44"up to 70" Long.

  • Strong and durable dog leash made of 1.25" wide fray resistant nylon.
  • Features heavy duty nickel plated swivel snaps and adjustment rings.
  • Leash can be easily adjusted from either end of leash for 44"-70" length.
  • Ideal for daily walks and training.
  • Dog leashes that are built to last. Most suitable for Large and XLarge dogs.
UPC 766150184990
Size Large/ XLarge
Color Black/Green
Pattern Dog
Brand Name Dogs My Love
Item Weight 8 Ounces
Closure Type Snap
Manufacturer Dogs My Love
Material Type Nylon
Target Species Dog
Item Dimensions L x W 44"L x 1.25"W

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.9 out of 5
★★★★★
118 ratings | 48 reviews
How item rating is calculated
View all reviews
5 stars
89% (105)
4 stars
1% (1)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (12)
Sort by

There are currently no written reviews for this product.